Location: | Doha, Qatar |
Client: | Qatar Petroleum |
Main Contractor: | CCEL part of CCC Group |
EPC Work | US$ 590 Million |
Year Awarded | 2008 |
Completion Date | 2013 |
Project Period | 42 months + 2 years operation & maintenance |
Details
Phase-II Category-2 which involves supplying:
– 3,000 m3/hr base scope and 8,000 m3/hr optional make-up water and receiving return blow down water from re-circulating seawater cooling towers (CTs) located on a number of end user plots;
– Cooling water to a once through consumer (IPP-3) with 93,000 m3/hr sea water from the existing once-through cooling system .
– 3,000 m3/hr base scope and 8,000 m3/hr optional make-up water and receiving return blow down water from re-circulating seawater cooling towers (CTs) located on a number of end user plots;
– Cooling water to a once through consumer (IPP-3) with 93,000 m3/hr sea water from the existing once-through cooling system .