| Location: | Abu Dhabi, UAE |
| Client: | ADNOC LNG (ADGAS) |
| Contractor: | CCEL |
| Engineering Work | US$ 0.8 Million |
| Year Awarded | 2013 |
| Completion Date | 2014 |
| Project Period | 11 months |
Details
Engineering Services for the Stress Analysis of the Piping using Caesar-II and make necessary modifications on engineering documents.
